Saturday 4 August 2018

Future plans (Pt.2)

 Construction begins!
Tools of the trade.

Gently "finessing" a rock to fit the track through!

 took me about 4 hours to get everything level, unfortunately because of the material the stakes are made of they bend quite easily and after a bit of thought I decided to leave them the way they were, eventually I plan on planting plants or something underneath them so hopefully you wont see the posts
 Another view of the future formation
 Thanks to melbournesparks (yes him again!) I was able to source some old decking material that once cut up was quite a suitable bridging material.

The loop on the left and right hand sides you can see the points for the future wye, I have about 6 sets of points still to construct so these have been "locked" out of use for the time being
 the finished extension!
 First train over the full loop


The new arrival... Converted from one of the railways Steeple cab electrics this box cab was one of the lines early experiments with dieselisation. I'll go into this loco a bit more in a future post.
The boxcab hauling a train over the extension, unfortunately shortly after this photo was taken it lost RC signal at the high end of the loop and ran off the end (lesson leant, if you're running always have the bridge in) and destroyed an end beam, broke both bogie mounts, smashed the cab and broke out most of the windows. Just another thing to fix.

Till next time.

No comments:

Post a Comment